Water, Sewage & Effluent March April 2019 | Page 15

When pumps shut down, a water surge occurs — where water continues along the pipeline for a certain distance, but then backwashes and causes a surge. www.waterafrica.co.za innovations Each welder joint has a coating on the outside of the pipe for corrosion prevention and sealing. A project of this scope and magnitude is not without its challenges. Barnard says, “Typically on site, you will find some M&D plant, and some plant from local suppliers. Although we have all the plant available in-house, first option is to use a portion of local plant. If the locals do not have the kit we’re looking for, then we’ll use our plant available.” Steyn says, “Whenever we need plant equipment, we speak to the project steering committee (PSC) — made up of councillors appointed by the council, and the local community liaison officer (CLO) — made up of community spokespeople. What makes this project interesting is that it starts in Tshwane and crosses into Moretele in the north-west — which means that not one, but two local communities are involved. Each community has their own appointed CLO. Each CLO represents the individual community’s needs and requirements and therefore each needs to give approval in all matters individually. This means whenever we hire labour, plant equipment, or any other items, it has to go through the individual CLOs, the PSC, and then out to the community. Then only does it come back to us, once all parties have agreed and approved the way forward,” says Steyn. Barnard says, “Aside from this being a time-consuming exercise — having to get permission every step of the way through the CLOs, the PSC, and the locals — it can also get quite complicated in that there is not one external supplier who will supply five different plant units, but five different suppliers each supplying Challenges time, but we keep record of it,” adds Barnard. Despite the challenges, M&D is on track to complete the project by mid- 2020, which will increase capacity to ensure the delivery of services across the water value-chain and support the ‘source-to-tap’ vision. Working closely with the municipalities, M&D will bring efficient water service delivery to the end consumer, communities, and industries served by Magalies Water.  one piece of equipment. The logistics itself is time-consuming, but it’s also understandably not very economical since you end up paying five suppliers, and not just one. “Stoppages do hamper production, but we have found that the best and quickest course of action is to involve the CLOs immediately and the local municipalities, who assist in solving the problem. A stoppage can be anything from between two to three hours at a Each pipe has a block with the chainage (linear pipe length), the joint number, the welder number, and the date the pipe was welded. Every joint is recorded. Water Sewage & Effluent March/April 2019 13 to drain the pipeline so you can work on the affected section. In addition to this there are isolation points, which require chambers to be built — which is civils work,” he says. Steyn says that pressure is at nine bar for the 700mm pipes, and this pipeline project will include surge tanks in case of a shutdown on the pumps. “When pumps shut down, a water surge occurs — where water continues along the pipeline for a certain distance, but then backwashes and causes a surge. The pressure when this occurs is so high that it can remove the water lining and even cause the pipe to break in some instances. For this reason, there will be surge protection, where the water comes up into a surge tank, returns at a slower rate, thereby reducing the flow pressure,” explains Steyn.