USG Boral Company-wide Project Reference 2019 | Page 38

5.4 Changi, Singapore  INFRASTRUCTURE CHANGI AIRPORT TERMINAL 4 20,000m 2 Total Ceilings 2017 Year Completed Project Description: Infrastructure, Airport Location: Changi, Singapore  Contractor: Takenaka Corporation (Singapore) Developer: Changi Airport Group Architect: Benoy Architect SAA Architects Pte Ltd FOR REFERENCE PURPOSE ONLY. NOT FOR GENERAL DISTRIBUTION OR COMMERCIAL PURPOSE. UNAUTHORIZED REPRODUCTION IS PROHIBITED. PROJECT REFERENCE