USG Boral Company-wide Project Reference 2019 | Page 35
5.1
Incheon, Korea
INFRASTRUCTURE
INCHEON INTERNATIONAL
AIRPORT TERMINAL 2
30,000m 2 30,000m 2
dBcheck
Acoustic plasterboard with sound
insulation performance 1.5-hour Fire-resistant Plasterboard
2017
Year Completed
Project Description:
Infrastructure, Airport
Location:
Incheon, Korea
Contractor:
Hyundai const.
Architect:
Keunjeong
PROJECT REFERENCE