UoP Racing Newsletters 3rd Issue (July 2014-FSUK) | Page 8
On Friday, the team focused on passing the remaining technical
inspection early on in order to be ready for the rest of static events that
started at 14:15. The team managed to get through technical (tech) and
chassis inspection without problems, then passed all rain test, tilt table
and brake test by 11:00 a.m.
Tilt test
Drivers’ Egress
All technical inspections passed; ready to race!
UoP Racing Team | University of Patras | Rio, Patras 26500,