UoP Racing Newsletters 3rd Issue (July 2014-FSUK) | Page 7
In the meanwhile the Class 1 team was queuing for the technical
inspection all morning, due to the slow pace of the technical committee.
Being extremely well-prepared, electrical inspection was passed on the
first go, but as the sun went down there was no time left to pass the
mechanical as well, which was left for Friday. In the meanwhile, the
Class 1 Business Plan Presentation took place, “one of the most even
BPP judging lately, that scored 55/75 points and excellent feedback
regarding all aspects of the material used and presented.
Electrical inspection
Rain test on
electrical inspection
Greece |uopracingteam.com| [email protected]