Uganda Baati Product Guide | Page 32

STANDARD INSTALLATION DETAILING FOR SAFLOK700 Sa t SL 700 Clip Purlin Column *NEVER re-use a Saflok 700 clip Step 1 F i x t h e f i rst S A F LO K - 7 0 0 c l i p s perpendicular to the gutter in a straight line on the edge first sheet to ensure straightness. Care should be taken to ensure that the overlap is facing away from the prevailing weather. Step 2 Locate the first sheet above the clips ensuring that the overhang into the gutter is correct. Push downwards on the SAFLOK-700 sheet until the decking is secured at every clip. Do not use excessive force. Step 3 Lap the next SAFLOK-700 clip over the top of the male rib. Step 4 The holes on the existing and new clip will align and hook into place on the self locating tabs. Fasten this section first and fix the remaining two holes as previously. Fasten all clips in this manner. Step 5 Lay the next SAFLOK 700 sheet. Inspections should be made periodically to ensure the decking is installed squarely. This can be done by comparing the coverage at the ridge and gutter line. At the end of the purlins cut the deck and clip to suit. Step 6 Locate the next sheet above the clips ensuring that the overhang into the gutter is correct. Proceed as from Step 2. 32