Travis AFB Sustainability Study Report Final Sustainability Study Report | Page 70

       BIO‐2H  BASH  Coordinate water body installation with Travis AFB  Based on the results of Strategy BIO‐2G, TSS Partner jurisdictions should include  procedures and appropriate design regulations for proposed water bodies,  including consultation protocol with Travis AFB.  On‐going            BIO‐2I  BASH  Determination of BASH‐relevant species  Travis AFB should continue to coordinate with other DOD installations and the  USFWS to identify certain species that pose greatest BASH risk in order to know  how to mitigate their presence in the region.  Other Partner: USFWS  Mid‐term           Page 56     Mid‐term  Identify water body design concerns for BASH  Travis AFB or TSS Partner jurisdictions should continue to work with resource  agencies to develop designs for stormwater facilities, wetland habitat  reconstruction, species habitat protection, or similar items that could attract birds  to minimize BASH concerns through design.  Military Compatibility Area  BASH  BIO‐2G  Issue / Strategy     Recommendations