Today Magazine Summer 2019 | Page 15

T H N C heck O ut GM ercy U’ s C ampus R enovations and N ew L oop R oad A digital rendering of the new Loop Road, starting from Admissions House which will connect to the back of campus by Alexandria Hall and Visitation House. These two digital renderings (above and below) show how the new gathering space and pedestrian walkway between Assumption Hall and the Lady Garden will look once construction is completed. I OOP n order to enhance the student experience and make our campus even more pedestrian-friendly, GMercyU has made great strides in the campus improvement project that began in January. As the first phase of construction comes to an end, a brand new loop road and pedestrian walkway now connects Admissions House and Alexandria Hall. In addition, a new pedestrian walkway added along Assumption Drive will reduce foot traffic on the road and offer visitors a quick and safe pathway to and from Admissions House, Hobbit House, and the center of campus. The renovation project continues with a section of Assumption Drive being closed to vehicle traffic and transformed into a grassy oasis for students, faculty, staff, and visitors to enjoy while navigating campus on foot. A rain garden set between Assumption Hall and Connelly Faculty Center will not only add beauty to the area, but also help prevent flooding by properly draining rainwater from impervious surfaces (such as asphalt) into nearby soil. These exciting changes and improvements will continue throughout the year. We look forward to sharing the results of the completed project with the GMercyU community in the future. TODAY 13