and cement grout curtain during construction are high. The earthfill materials of 8.5 million m3 required for the project is large. Shortage of construction materials from the project site will lead to import of construction materials. Besides higher construction cost, risk to villagers and impact on traffic at Bkt Mertajam will be high due to the large number of construction vehicles passing through. MANAGING CONSTRUCTION RISKS During the course of c on s t ru c t ion t here were conditions which deviated from original tender designs. The major issues encountered were:●● Impact of commercial quarry operation on dam construction ●● Risk of leakage at left abutment of new dam due to rock mining at quarry ●● Impact of construction activities on safety of existing dam ●● Potential shor tage of earthfill and filter materials ●● Risk of Interruption to raw water supply from existing dam. Figure 5: A View of Draw-off Tower Upstream of Draw-off Tunnel Figure 6: Valve House Downstream of Draw-off Tunnel Impact of Commercial Quarry Operation After construction of the new dam commenced in 2012 ground movement s were detected at the dam site due to rock blasting activities at the Weng Lee Quarry adjacent the left abutment of dam (see Figure 8). There was a serious concern about damage to the Figure 7: Raising Of Existing Dam 9