The Ingenieur Vol. 65 Water Power | Page 10

INGENIEUR Stage 2 works to raise the existing dam crest from EL45.72 m to EL 56.60m is currently under construction as shown in Figure 7. The Labyrinth type spillway is located at the right abutment of the heightened dam. The Challenges Figure 2: Existing Mengkuang Dam Figure 3: Typical Design Section of New Dam Figure 4: A Upstream View of New Dam Completed At Left Valley 86 VOL - MARCH 2016 VOL65 55JANUARY JUNE 2013 The project involves construction of a new dam and raising of the existing dam. It is a large scale civil engineering project with many stakeholders and involves complex technical, environmental and social issues and construction risks. Engineering solutions have to overcome the physical constraints, cost and time overrun. After construction of the new dam, water stored at the existing dam will be transfered to the new reservoir on the left valley to enable continuity of raw water supply to the Sg Dua water treatment plant (WTP) throughout the construction period. The existing reservoir will be emptied to facilitate construcion works for raising the existing dam. Risk of construction is high. Any mishap, especially during foundation excavation for the new dam will affect the safety of the existing dam. Any interruption of raw water supply from the existing dam will have serious adverse impact on the water supply system in Penang. Ro ck blas ting at the commercial quarry near the left abutment of the new dam will affect the integrity of the new dam. The risks of damage to the concrete structures especially the plastic concrete cut-off wall