The Civil Engineering Contractor October 2018 | Page 10

ON CONSULTANTS’ DESKS Hydropower project for Zambia Project: Institutional Client: Lufubu Power Company (LPC) Location: Zambia The preferred bidder will be expected to carry out all the works on a full turnkey basis for a fixed price, with LPC wishing to finance all or part of the project through limited recourse project finance. The financing package will include Export Credit Agency (ECA) financing. The firm selected to carry out the works acknowledges that LPC requires ECA supported funding for the project, which will need to be executed in a manner acceptable to LPC. Firms submitting an EOI must have proven experience in EPC assignments for hydropower projects, preferably in sub-Saharan Africa, and shall not have been blacklisted by any bank or financial institution. The Lufubu Hydropower Project (Lufubu HPP) has been submitted to the Zambia Environmental Management Agency (Zema) for EIA approval. Studio Pietrangeli is designing the Lufubu HPP cascade. The client is LPC, a special-purpose vehicle formed under the laws of Zambia as an independent power producer (IPP) seeking to develop a cascade project. LPC was established to develop a 326MW hydropower cascade on the Lufubu River Basin in the Northern Province of Zambia and is now requesting expressions of interest from experienced bidders for the design, engineering procurement, construction, and commissioning (EPC) of the first stage of the hydropower cascade with a nominal capacity of 163MW. Selected applicants will be invited to submit a proposal in response to the tender documents by submitting an EOI, which demonstrates their ability to provide the works, setting out references for at least four dams at least 50m high, and four power plants with an installed power of at least 50MW, and 100km of transmission lines with 132kV minimum nominal voltage, which the firm has implemented and commissioned over the past 20 years. The proposed Lufubu Hydropower Project will comprise three power plants (LU1, LU2, and LU3) in cascade with all the components of the power train: • Interconnecting 132kV transmission lines and associated • Switchyard(s)/substation(s) linking the three power plants • Construction camps and access roads to the hydropower sites. The Lufubu Power Company (LPC) is requesting expressions of interest from experienced bidders for the design, engineering procurement, construction, and commissioning of the first stage of the hydropower cascade with a nominal capacity of 163MW. Tanzanian road upgrade Project: Institutional Client: TANROADS Location: Tanzania This invitation for expression of interest follows the General Procurement Notice that appeared in the Public Procurement Regulatory Authority’s Tenders Portal dated 18 May 2018. The Government of the United Republic of Tanzania, through Tanzania National Roads Agency (TANROADS), has set aside funds for the operation for 8 - CEC October 2018 carrying out consultancy services during the 2018/2019 financial year. It is intended that part of the proceeds of the fund will be used to cover eligible payments under various contracts for feasibility study and detailed engineering design. The regional manager’s office, TANROADS Singida, on behalf of the chief executive officer, now invites sealed tenders from eligible consultancy firms to indicate their interest in providing various services: feasibility study; detailed engineering design; preliminary environmental and social impact assessment; economic evaluation and preparation of tender documents for upgrading of Sabasaba–Sepuka–Ndago–Kizaga Unpaved Regional Road (R429) (77.4km) to bitumen standard.