Steel Construction Vol 40 No 4 - Metal Cladding and Light Steel Frame | Page 27

SAISC profile of steel. We visited structures including Protea Dome in Sandton through to flight simulators and the inspired steel structures that house them. One of the lasting memories from the programme was getting to see steel being manufactured on an extremely large scale. It was an experience that remains with me to this day. In response to this inspiring opportunity, I feel it is rather telling of the New Generation programme that the SAISC wrote,“The SAISC congratulates and thanks all the mentors and top performers who participated in New Generation 2011 and hope to hear the following names in the future of this industry.” I was fortunate to be one of those top performers, and now proudly am a part of this dynamic industry. mechanical engineers to deliver a holistic design solution to the mining industry. ABOVE: Emma on site vists as part of the New Generation Programme. The aspect I love the most it that 90% of the design work is purely in steel. The Present work in the steel industry structures are also designed with unusual I am presently working for ET-Global which is a specialist structural engineering consultancy in Cape Town. We focus on the onshore and marine mining industries. ET-Global works closely with process and boundary conditions ranging from their support (in the marine industry) to the equipment which they are required to support. Much of the mining equipment used in processing/treatment plants is vibrating equipment which requires dynamic tuning of the structures on which it is sitting. This is a hugely interesting portion of the design of the steel structures and also exhibits the strength and versatility of steel beautifully. Steel Construction Vol. 40 No. 4 2016 25