SOLLIMS Sampler Volume 9, Issue 1 | Page 31

space for self-reflection and sharing lessons in a sensitive and transparent way within an organization. Since first piloted in 2012, almost 30 internal reviews have taken place within CMI’s organization through a systematic process/timetable. Approximately 5-6 reviews are now conducted annually, and each CMI project is studied about once every two years. The general process/structure of an Internal Review includes 5 phases: 1) desk study of project documentation, 2) interviews, 3) participatory review workshop, 4) report draf