Shaw Book - Volume 1 Mar. 2016 | Page 29

018_033 Shaw_Structural 10/21/04 6:57 PM Page 27 completed two structural buildings on Rodeo Drive — the Prada building and the 308 Rodeo Drive retail building — as part of its infill project resume, as well as replacing Beverly Hills’ crosswalks with specified Lithocrete® Shaw & Sons’ contract includes footings, grade beams, column pads, four levels of black structural concrete at the elevator and stair corridor, white concrete structural walls, site and civil concrete. paving. As with all construction projects in Beverly Hills, concrete pours must take place at night to avoid any disruption of daytime business or other activities. Beam and embedded plate prior to concrete placement. 27 Basement walls constructed prior to the 1st floor construction. M.D.O. elevator core prior to wall reinforcing steel. Photo shows structural scaffold. Second-floor metal pan system before placing of structural lightweight.