Shaw Book - Volume 1 Mar. 2016 | Page 152

140_151SubgradeFrmwrk 10/21/04 11:27 PM Page 150 Subgrade Preparations 150 Vibratory roller compaction of 4-inch maximum sand lift to complete a total of a 12-inch section. P roper subgrade preparation the client, Shaw & Sons first installs tions provided by the soil engineer(s). is the first step to correctly Mirafi 500 X Geotex fabric for soil sep- Additional lifts are installed in the forming a cast-in-place proj- aration and stabilization. This prevents same manner until the proper grade is ect. The photos on these additional cracking and displacement achieved. Finally, equipment such as pages show Shaw & Sons typical pro- of concrete, keeping it securely and vibrating rollers for large areas or walk- cedure for installing based material and evenly in place for the long term. behind vibrating plates for pipe pene- washed concrete sand. Although not Next, sub-base or sand is installed in 4- trations and edges should always be used. specified and at no additional cost to inch lifts and saturated to specifica-