The ship will feature three multistory waterslides, all of which
twist and turn over Central Park
10 decks below.
reduction were utilised, with the aid
of high-quality designing tools used
in the noise reduction calculations,”
AN
N
IV
ER
SA
RY
recounts Nousiainen.
Just now, air-conditioning installations are being finalised on board
the ship. Deliveries of the A/C units
and components amounted to several
hundred truckloads.
”By June 2015, all of the air-conditioning units have been delivered to
the shipyard and also installed to a
large extent. According to schedule,
the first A/C systems will be taken into
PROTACON MARINE
25 years of expertise
in automation
use in June. It goes without saying
that representatives of Koja Marine
will be at the shipyard to supervise
the work related to the commissioning of the ship’s air-conditioning systems,” Nousiainen mentions.
Koja Marine was responsible
for the design, deliveries, electrical
cabling, automation and commissioning of the air-conditioning sys-
Modernisations of
electric drives and
automation systems
for special vessels.
Turnkey deliveries
upon request.
tems, while STX’s shipyard handled
the installation.
”Considering the size of the
overall delivery, the A/C system
installations have been very nicely on
schedule. Cooperation with the shipya ɐ