seatec - Finnish marine technology review 1/2019 | Page 28

R auma Marine Constructions (RMC), RMC, noted that at first the agreement we really have had a great success with which is operating the Rauma Ship- was about the delivery of two blocks with this,” says Jyrki Heinimaa and adds that yard, and Meyer Turku, the owner of Turku an expectation that more will follow, pro- the works on the further two blocks are Shipyard, are engaged in a new kind of vided that everything works out. As the already being carried out. cooperation. Meyer Turku ordered from “pilot blocks” were a success, Meyer Jyrki Heinimaa notes, that as such, Rauma two ship blocks for Costa Esmer- wasted no time ordering two more. A ship there is nothing extraordinary about the alda cruise ship built in Turku, and soon as huge as Costa Emeralda is assembled of cooperation of Turku and Rauma, because after an order of two more blocks fol- about hundred blocks, so there’s plenty of the whole industry works as a network and lowed. work to go around. shipyards communicate with each other In the interview given at the end of “This job has given us an experience closely. “When Turku asked, whether we September Jyrki Heinimaa, the CEO of how to handle thin 5 mm sheets – and would be interested in Costa Emeralda, 28 seatec 1/2019