“When working outside, weather poses always Photo: Royal Caribbean International the biggest challenges – during rain, decking systems can’t be undertaken at all if proper weather protection is not in place.” During the most hectic phase in the summer, there were 30 people working on the deck coverings. The covering project took about 10 The Great Decking Challenge months to complete. Lemminkäinen has a long experience regarding cruise ship L emminkäinen provided the deck covering systems for the out- coatings. Oasis received the same beauty treatment as Allure, door deck areas of the Allure of the Seas. In addition, Lem- and the company worked also on the three Freedom-class ships. “In fact, Lemminkäinen made the first ship deck coatings in minkäinen coated the loft balconies. The total work area was 17,000 square metres. Turku in 1987,” Hulmi says. Tomi Hulmi, Product Group Manager for Lemminkäinen Rak- Presently, the company is doing deck coverings on P&O Fer- ennustuotteet Oy, says that the schedule was a tight one, but eve- ries’ two vessels in Rauma and is involved in the Color Line con- rything was completed in time. version project in Helsinki, as well. ■ BevTec: Sweet Soda Story Puttek Oy – Specialists for Pipe Clamps and Supports B everage sales onboard luxury cruisers is a must – a thirstquenching soft drink under the hot sun goes a long way in setting the right holiday mood. BevTec has provided complete B ased in Toijala (Finland), Puttek Oy is a company specialised in the production of high quality pipe clamps and supports beverage dispense systems for the biggest cruise ships out for ships and offshore structures. Established back in 1982 it is to- there – Allure of the Seas is only the latest addition to the list. day the largest supplier of such components for the Finnish ship- “We supplied about 140 bar dispense pistols to Allure, building industry. The clients list comprises renowned shipyards along with nine beverage towers,” says Kim Sundström, Project Manager from BevTec. in Finland, Germany and France. Puttek’s sophisticated product range features a vast varie- Allure is the biggest worksite as of yet, edging sister ship ty of steel and aluminum pipe clamps and supports, which are Oasis by less than ten beverage pistols. Altogether, the soda surfaced and insulated as specified by the client. Custom made operation took one year to complete, with 2-3 BevTec pro- products manufactured according to client drawings and speci- fessionals working hard to equip the entire vessel with “re- fications are supplied as well. Thanks to their outstanding qual- freshment infrastructure”. ity Puttek’s products are used in numerous demanding types of “In addition to soda, there’s also juice available.” vessels and offshore structures, including cruise vessels, oil tank- According to Sundström, work on Allure was not as ers, gas tankers, oil drilling platforms as well as storage tankers. tough as it sounds, since the general layout was already fa- Passenger shipping references include, among many others, the miliar from Oasis. Still, the project could not be wrapped up “Stena Discovery”, “Superfast III” as well as her sister “Super- in Finland: fast IV”, and Royal Caribbean Cruise Lines’ “Voyager of the Seas” “In the end, we flew to Florida to finish the outdoor bev- along with her sister ships. ■ erage areas of the ship.” This work could not be conducted on the Atlantic crossing, due to the risk of freezing. ■ 14 seatec 1/2011 More information: www.puttek.fi