Proposed City Bond 2018 Proposed Bond 2018 | Page 8

BOND 2018 PROPOSITION A - STREETS (Continued) 8. SOUTH STAPLES STREET Baldwin Blvd. to Kostoryz Rd. $ 6,650,000 Reconstruction of existing 5-lane road- way with new pavement, curb & gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, traffic signalization improvements, illumina- tion improvements, and concrete bus pads. 9. BRAWNER PARKWAY Carroll Ln. to Kostoryz Rd. $ 3,000,000 Reconstruction of existing 4-lane roadway (North Brawner and South Brawner, divided by wide ditch medi- an) with new pavement, curb & gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, traffic signalization improvements, and illumi- nation improvements. 10. SWANTNER DRIVE Indiana Ave. to Texan Tr. $ 2,600,000 Reconstruction of existing 2-lane roadway, with new pavement, curb & gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, traffic signalization improvements, and illumination improvements. Consider- ation will be given for improvements to bike mobility as a “bike boulevard” per the adopted MPO bicycle mobility plan. 11. GOLLIHAR ROAD Greenwood Dr. to Crosstown Expy. $ 3,700,000 Reconstruction of existing 4-lane/ 5-lane roadway with pavement, curb & gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, traffic signalization improvements, illumination, and concrete bus pads. 12. FRIO / HACALA / DORADO STREETS CORRIDOR Greenwood Dr. to Martin St. $ 1,600,000 Rehabilitation of the existing 2-lane corridor, with new pavement, side- walks, ADA compliant curb ramps, signage, pavement markings, and illumination improvements. Consider- ation will be given to better align the pavement widths of Frio, Dorado and Hacala with increased widths to both Dorado and Hacala. 13. LAGUNA SHORES ROAD Graham Rd. to SPID $ 2,050,000 Reconstruction of existing 2-lane roadway. New roadway will be elevat- ed 5 feet above mean sea level and will have a retaining wall placed where needed to protect against wave action. No curb & gutter is planned. Traffic control signs are an indication that city streets are being improved. 8 Project scopes, locations and costs are estimates based on information currently available and are, therefore, subject to reasonable change on the basis of new and refined information up to the time of completion.