BOND 2018
PROPOSITION A - STREETS
STREET IMPROVEMENTS
$ 52,000,000
1. LEOPARD STREET
Nueces Bay Blvd. to Palm Dr.
$ 3,100,000
Reconstruction of existing 4-lane
roadway, with new pavement, curb &
gutter, sidewalks, ADA compliant curb
ramps, signage, pavement markings,
traffic signalization improvements, and
illumination improvements. Proposed
section will match the Bond 2012
program alignment and lane configu-
rations.
2. CALALLEN DRIVE
Red Bird Ln. to Burning Tree Ln.
$ 1,050,000
Reconstruction of existing 2-lane road-
way with new pavement, sidewalks,
ADA compliant curb ramps, signage,
and pavement markings.
3. CALLICOATTE ROAD
IH 37 to Up River Rd.
$ 900,000
Reconstruction of existing 2-lane road-
way with new pavement, signage, and
pavement markings.
4. BEACH AVENUE
E. Causeway Blvd. to Dead End at
Gulfbreeze Blvd.
$ 1,000,000
Reconstruction of existing 2-lane
roadway with new pavement, curb &
gutter, sidewalks, ADA compliant curb
ramps, signage, pavement markings,
and illumination. Includes bike mobility
improvements per the adopted MPO
bicycle mobility plan and approved in
North Beach Area Plan.
5. N. BEACH AREA PRIMARY
ACCESS
Beach & Timon / Surfside Intersec-
tion
$ 1,250,000
Design and construction of a new
curved access road from E. Causeway
Blvd. onto Timon Blvd. with a new
traffic circle at intersection of Timon /
Surfside and Beach roads. Provides
a new route for the single access road
into North Beach from the new Harbor
Bridge. Traffic circle connects Timon
/ Surfside and Beach and converts
Beach Avenue to one-way from Surf-
side to E. Causeway Blvd. New traffic
circle also allows development of new
gateway feature for the entry into North
Beach approved in the North Beach
Area Plan.
improve access from the new Harbor
Bridge and the beach approved in the
North Beach Area Plan.
7. N. BEACH COASTAL
PROTECTION
Breakwater Barrier
$ 250,000
Preliminary engineering and permitting
with USACE, GLO, Port of Corpus
Christi and other agencies for the de-
sign and construction of new breakwa-
ter barriers to mitigate beach erosion
and coastal flooding as approved in
the North Beach Area Plan.
GLOSSARY
ADA - Americans with Disabilities Act
GLO - General Land Office
MPO - Municipal Planning Organization
of Corpus Christi
USACE - United States Army Corp of
Engineers
6. N. BEACH GULFSPRAY AVE.
PEDESTRIAN / BIKE ACCESS
Beach Access to E. Causeway Blvd.
$ 300,000
Pedestrian and bicycle infrastructure
Improvements to create a new trail for
Project scopes, locations and costs are estimates based on information currently available and are, therefore, subject to reasonable
change on the basis of new and refined information up to the time of completion.
7