Proposed City Bond 2018 Proposed Bond 2018 | Page 7

BOND 2018 PROPOSITION A - STREETS STREET IMPROVEMENTS $ 52,000,000 1. LEOPARD STREET Nueces Bay Blvd. to Palm Dr. $ 3,100,000 Reconstruction of existing 4-lane roadway, with new pavement, curb & gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, traffic signalization improvements, and illumination improvements. Proposed section will match the Bond 2012 program alignment and lane configu- rations. 2. CALALLEN DRIVE Red Bird Ln. to Burning Tree Ln. $ 1,050,000 Reconstruction of existing 2-lane road- way with new pavement, sidewalks, ADA compliant curb ramps, signage, and pavement markings. 3. CALLICOATTE ROAD IH 37 to Up River Rd. $ 900,000 Reconstruction of existing 2-lane road- way with new pavement, signage, and pavement markings. 4. BEACH AVENUE E. Causeway Blvd. to Dead End at Gulfbreeze Blvd. $ 1,000,000 Reconstruction of existing 2-lane roadway with new pavement, curb & gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, and illumination. Includes bike mobility improvements per the adopted MPO bicycle mobility plan and approved in North Beach Area Plan. 5. N. BEACH AREA PRIMARY ACCESS Beach & Timon / Surfside Intersec- tion $ 1,250,000 Design and construction of a new curved access road from E. Causeway Blvd. onto Timon Blvd. with a new traffic circle at intersection of Timon / Surfside and Beach roads. Provides a new route for the single access road into North Beach from the new Harbor Bridge. Traffic circle connects Timon / Surfside and Beach and converts Beach Avenue to one-way from Surf- side to E. Causeway Blvd. New traffic circle also allows development of new gateway feature for the entry into North Beach approved in the North Beach Area Plan. improve access from the new Harbor Bridge and the beach approved in the North Beach Area Plan. 7. N. BEACH COASTAL PROTECTION Breakwater Barrier $ 250,000 Preliminary engineering and permitting with USACE, GLO, Port of Corpus Christi and other agencies for the de- sign and construction of new breakwa- ter barriers to mitigate beach erosion and coastal flooding as approved in the North Beach Area Plan. GLOSSARY ADA - Americans with Disabilities Act GLO - General Land Office MPO - Municipal Planning Organization of Corpus Christi USACE - United States Army Corp of Engineers 6. N. BEACH GULFSPRAY AVE. PEDESTRIAN / BIKE ACCESS Beach Access to E. Causeway Blvd. $ 300,000 Pedestrian and bicycle infrastructure Improvements to create a new trail for Project scopes, locations and costs are estimates based on information currently available and are, therefore, subject to reasonable change on the basis of new and refined information up to the time of completion. 7