BOND 2018
PROPOSITION B - ADDITIONAL STREETS
STREET IMPROVEMENTS
$ 22,000,000
Downtown improvements are included in this Proposition. Chaparral Street Phase I (Bond 2008) is shown above.
1. DOWNTOWN PEDESTRIAN
SAFETY IMPROVEMENTS
$ 850,000
Pedestrian safety improvements
including new crosswalks, signage,
pedestrian signals, and traffic signals
at select cross streets in the downtown
area. Additionally, the project contin-
ues initiatives from previous Bond proj-
ects to reduce traffic congestion while
improving public safety and access in
the downtown area.
2. DOWNTOWN LIGHTING
IMPROVEMENTS
$ 650,000
Prioritized lighting (illumination)
improvements along the north/south
corridors to the downtown streets.
3. NORTH LEXINGTON
BOULEVARD
Hopkins Rd. to Leopard St.
$ 2,400,000
Reconstruction and widening of ex-
isting 2-lane roadway with new pave-
ment, signage, pavement markings,
and illumination improvements.
5. ALAMEDA STREET
Louisiana St. to Chamberlain St.
$ 2,580,000
Reconstruction of existing 5-lane
roadway with new pavement, curb &
gutter, sidewalks, signage, pavement
markings, traffic signalization improve-
ments, illumination improvements and
concrete bus pads.
4. EVERHART ROAD
SPID to McArdle Rd.
$ 1,170,000
Rehabilitation of existing 5-lane road-
way with new pavement, curb & gutter
repair, sidewalk, ADA compliant curb
ramps, signage, and pavement mark-
ings. Consideration will be given for
safety lighting within the project limits.
Project scopes, locations and costs are estimates based on information currently available and are, therefore, subject to reasonable
change on the basis of new and refined information up to the time of completion.