Pinal County JLUS Final Report | Page 168

  SA‐5:  Pinal Airpark’s Runway Protection Zone extends over a portion of Silverbell  Army Heliport.  Location:    Silverbell Army Heliport  Approximately 0.48 acres of the Runway Protection Zone for Runway 12‐30 at Pinal  Airpark extend over a portion of the Silverbell Army Heliport.  If the Airpark runway  were enlarged or used by additional types of aircraft in the future, a larger Runway  Protection Zone that would affect more land on Silverbell Army Heliport could be  necessary.  RECOMMENDED STRATEGIES  SA‐5A: Implement DoD‐standard clear zones and accident potential zones for Pinal  Airpark.  Primary Party:  If plans move forward to develop a partnership for Air Force aircraft use of Pinal  Airpark, the Airpark should coordinate with the Air Force to identify the  requirements, dimensions, and locations of DoD‐standard runway clear zones and  accident potential zones to use for planning purposes.  These zones should be  mapped and included in Pinal County and Town of Marana planning documents to  promote compatible planning decisions in the future.    Partners:   Pinal County   Town of Marana   U.S. Air Force  Strategy Type:  Timeframe:   Pinal Airpark  Geographic Area:  N/A            VERTICAL OBSTRUCTIONS (VO) ISSUES  VO‐1:  Future power transmission line projects could pose helicopter flight hazards.  Location:    As Arizona’s power grid continues to grow to support new development and  increasing demand, new power lines will need to be installed.  New utility corridor  and power line construction should be coordinated with the AZARNG to mitigate  potential impacts to helicopter flight areas, especially those where low‐level training  occurs.  Project Area  RECOMMENDED STRATEGIES  VO‐1A: Ensure FAR Part 77 compliance.  Primary Party:  For all new, redeveloped, or rehabilitated structures (including electrical transmission  towers / lines, cellular and radio transmission towers, etc.), the reviewing / approving  entity should require proof from the developer of compliance with FAR Part 77 height  limit requirements to minimize vertical obstructions.  As part of the FAR Part 77  review, the developments and structures should be determined as compatible with  and not pose a safety hazard to air operations in the region.   Strategy Type:    150 Power and utility providers  Geographic Area:  Timeframe:    FMR Airspace Protection  MCA; Helicopter TFTA  MCA; Rittenhouse  Overflight MCA, Picacho  Peak Stagefield Airfield  Obstructions MCA, SBAH  Airfield Obstructions  MCA  Implementation Plan