For more information on this project, please contact: Randolph W. Marshall, PE Senior Electrical Engineer rmarshall@pennoni.com 215-254-7711 and changed the distribution to mostly overhead lines. Existing equipment had to be removed for safety and larger duct banks and manholes were installed to provide pathways for the medium voltage cables, along with additional pathways for future lines. Pennoni provided the project management for site, electrical, and mechanical systems. Stormwater lines were relocated. All of the site work was completed and the purchased 68.5-ton modular building was craned into place at the time of delivery. Pennoni completed wiring to and from the generator, sources and loads, as well as all of the control communication lines. In addition, Pennoni provided settings for the equipment protection relays and coordinated between the vendors and ETS for a successful installation. P E N N O N I | 25