advanced engineering show preview
• Intuitive drag & drop GUI
for fast test creation
• Touch-screen enabled
• Extensive suite of calculations
for materials testing
• 4 models available: 5, 10, 25 and 50 kN
• Optional extensometry
and full range of test fixtures
connect 2 cleanrooms pioneering
offsite cleanroom construction at
advanced engineering 2017
Visitors can discover how
Connect 2 Cleanrooms’
cleanroom systems (STAND B50)
is using the latest construction
methods to reduce failure
rates and improve consistency
for clients, adding value and
efficiency to a process.
By using the latest advances in
Building Information Modelling
(BIM) and off-site construction
techniques, Connect 2
Cleanrooms’ methodology
can potentially deliver a 30-
50% timescale reduction to a
cleanroom project.
Offsite construction delivers
a consistent cleanroom
environment, with 100%
personalisation. It also has the
added benefit of a ‘clean’ on site
assembly, as every component
is pre-engineered.
38
PECM Issue 29
A challenge for offsite
construction is adapting the
cleanroom to fit within existing
buildings and structural layouts.
Connect 2 Cleanrooms use
BIM techniques such as point
cloud 3D scanning; ensuring
connecting interfaces between
the cleanroom and building are
managed to precise tolerances.
Each cleanroom is designed
specifically around
organisations’ production
environments, to protect
processes from airborne
contamination. Visitors to
Advanced Engineering can
discover its scalable cleanroom
design options, such as
hardwall, softwall and panel
system wall construction.
www.connect2cleanrooms.com