PECM Issue 28 2017 | Page 31

EDITORS CHOICE New Product Launch – Contractor Kit 1 The LOBO System can be assembled quickly, easily and safely in around, above desks or restricted access areas, without the need for tools, by your own in-house maintenance crew. This means out sourced scaffolding labour costs can be reduced without comprising safety. Areas, previously considered difficult to get to, can now be accessed with ease for maintenance and cleaning purposes. In addition, the LOBO System is available 24 x 7 and so puts you in control of what and when you schedule your maintenance tasks. The LOBO Contractor Kit 1 quickly flat packs into a small van for field based engineers. It can be assembled to a maximum standing height of 2.75m and uses 1.2m LOBO deck boards as shown. Safety Steel modular components, rigid structure and extremely adjustable. Assembly Fast, no tools are required and the system flat packs for easy transportation Multiuse Reconfigured to meet different requirements, can be made smaller or larger with the addition of kit. Training Certified competency training is available to ensure safe assembly and use. www.lobosystems.com [email protected] + 44 (0) 1332 365666 £2,590.00 Which includes one hour certified complimentary training for two delegates. Excludes Delivery & VAT Issue 28 PECM 31