for drainage and repaving that could be programmed into the undergrounding project. Additionally, the City of West Palm Beach plans on a number of watermain replacements throughout the project areas, as does FPU as part of their bare steel gas main replacement program. Our recommendation is to allow these Town infrastructure projects and those projects desired by outside entities to share in the roadway restoration costs. This provides a benefit to both the Town and the other entities in that no single agency is responsible for the amount of roadway repaving that they would be required to perform if they performed their project on a stand-alone basis. Another cost saving measure related to paving that can mitigate risks to the project budget is the deferral of milling and resurfacing until after a number of phase areas have been completed. In this manner, miles of streets can be bundled into a milling and paving bid package that will gain the interest of the larger highway paving contractors and allow the Town to achieve volume pricing that only large paving projects can provide. The Town can also consider the direct purchase of materials to achieve sales tax savings. As a municipal agency, the Town can procure materials on a tax-free basis from material suppliers. The Town has a successful history of 78 | CHAPTER EIGHT working with their construction managers to procure large quantities of materials in this manner. The Town should work collaboratively with their contractor to allow this direct purchase to occur while keeping the responsibility for material delivery and storage with the contractor. does not look the same as the previously ARCOM approved Town standard lighting options. If the Town desires to pursue FPL standard lighting, it is recommended that the ARCOM approval process begin as soon as possible. Previously unbudgeted costs for improvement