Palm Beach Undergrounding Master Plan COMPLETE MP Online-v4 | Page 6

technology, various utility and stakeholder requirements, and changes with other work programs within the Town that may influence the implementation of the undergrounding program in the future. The program is proposed to contain eight phases with most phases containing two separate sub-phases in an effort to accelerate the implementation schedule. Each phase is anticipated to have a construction duration that spans 18 to 24 months. A new phase will begin construction in the summer of each year between 2017 and 2024. This allows for adjacent phases to overlap in their duration which in turn accelerates the implementation schedule. In general, the work will begin at the extreme north and south ends of the Town and progress towards the center. The plan provides recommendations related to the timing of major infrastructure projects performed by the Town and outside entities. Kimley-Horn assessed the potential traffic impacts from construction for each phase of the project. The TMP sets forth overall guiding principles (general guidelines) for use by the Town and affected contractors during the implementation of the undergrounding program. The TMP may evolve over time, but its current role is to assist in the development of the design of construction phasing plans, traffic control plans, and project specification documents, and to facilitate discussions between the Town, designers, utility owners, contractors, and other key stakeholders related to traffic impacts. It is a tool to better coordinate construction traffic impacts as specific permits are applied for by the construction community. Graphical TMP maps for each phase of the undergrounding program, along with general traffic control guidelines for the program, were developed and are contained in this master plan. Traffic Management Plan Development Risk Assessment A Transportation Management Plan (TMP) was developed to coordinate traffic impacts related to both the undergrounding program and other known significant infrastructure projects to minimize impacts to the residents and businesses. Based on the phasing plan and the sequencing of these projects, Risks are involved with any project, and a project of this magnitude is no exception. These risks can impact the project schedule and/or the project budget. By identifying these risks ahead of time, steps can be taken to mitigate them. An assessment of known risks to budget and schedule, both in 2 | CHAPTER ONE terms of the design phase and construction phase, was made in order to identify these risks and take steps to mitigate them. Opinion of Schedule Based on the Phasing and Sequencing Plan, an opinion of schedule was developed to better understand how each individual phase of the program would interact with each other during the implementation process. Schedule considerations were developed through discussions with the Town, area contractors with expertise in undergrounding, and the utility owners. Design activity durations were based on discussions with the Town and utility owners related to the process. The schedule for the first phase has been highly compressed to meet a goal of beginning construction in the summer of 2017. It is not expected that this pace can be maintained by the utility owners into the future as design and construction of multiple phases will be occurring simultaneously. Therefore, the schedule contains earlier starts for design and easement acquisition activities for subsequent phases closer to the beginning of the program so longer design/easement acquisition durations can be achieved later in the program. This increases the probability design and easement acquisition can be completed on schedule on a reliable basis throughout the remainder of the program. Construction activity durations are based on reasonable production rates from area contractors with undergrounding expertise. Combining these production rates with mass quantities for the project that were developed as a part of the opinion of cost development yielded significant activity durations that were then incorporated into the overall schedule. Appropriate schedule contingencies were also applied to account for normal weather impacts, potential geological challenges (rock), and unforeseen conditions. The program schedule began in May 2016 with the development of this master plan and the detailed design of Phase 1 North and Phase 1 South. Construction activities are expected to begin in the summer of 2017 with Phase 1 North and Phase 1 South. Construction durations for each phase range from 18 to 24 months depending on the quantity of work to be performed and complexity of each Phase. To accelerate the schedule, each phase consists of two project areas that will be under construction simultaneously. Additionally, the construction schedule for each phase overlaps the previous adjacent phase construction schedule by six months to one year. The overlap of the construction activities in each phase is subject to “Heavy” underground construction being complete in the previous phase prior to allowing “Heavy” underground TOWN OF PALM BEACH