Palm Beach Undergrounding Master Plan COMPLETE MP Online-v4 | Page 41

Royal Park Bridge
4.3.6 Florida Department of Transportation
4.3.7 Florida Power & Light
4.3.9 Comcast
The Florida Department of Transportation ( FDOT ) is responsible for the ownership and maintenance of the three bridges that connect the Town of Palm Beach to the mainland as well as SR A1A ( a . k . a . South Ocean Boulevard and South County Road ). Kimley‐Horn requested information from the FDOT regarding any proposed projects they have currently budgeted within their work program within the Town .
There are two projects in the FDOT ’ s current work program that have or will impact the Town . The first project , the Flagler Memorial Bridge replacement project , has been under construction for several years and is expected to be complete in 2017 . The second project , the Southern Boulevard . ( SR 80 ) Bridge replacement is anticipated to begin in 2017 and continue until early 2021 . Utility relocations are wrapping up and the temporary bridge construction process is expected to begin in April 2017 . The FDOT has no other planned projects within the Town .
FPL allowed Kimley-Horn to view atlas level data of the Town ’ s electrical distribution system . However , they would not provide copies for Kimley‐Horn due to confidentiality and security concerns . They did provide specific record data for their systems in the areas north of Onondaga Avenue and south of Sloan ’ s Curve . Maps of FPL ’ s existing electrical system are not included in this master plan document to protect the confidentiality of this information .
4.3.8 AT & T
AT & T provided Kimley-Horn with atlas level data of the telephone / communications distribution system within the Town . Detailed record drawings and information related to their system is not available according to AT & T . Much of the underground trunk line system will need to remain in service during the implementation of the program and will need to remain after completion of the program . Maps of AT & T ’ s existing network are not included in this master plan document to protect the confidentiality of this information .
Comcast provided Kimley-Horn with atlas level data of the cable television / communications distribution system within the Town . Detailed record drawings and information related to their system is not available according to Comcast . Maps of Comcast ’ s existing network are not included in this master plan document to protect the confidentiality of this information .
Existing aboveground electric , cable TV , and telephone utilities between Peruvian and Chilean Avenues
Town-Wide TOWN-WIDE UNDERGROUNDING OF of UTILITIES Utilities PROGRAM Program
MASTER PLAN DOCUMENT
Document
DATA COLLECTION | 31