Gas main replacement by Florida Public Utilities sanitary forcemain transmission facilities in this area. These facilities will need to remain after completion of the program and will need to remain in service during the implementation of the program. The consultant team coordinated with a representative from the Town of South Palm Beach regarding South Palm Beach’s existing infrastructure as well as any planned improvement projects within the limits of the Town’s proposed undergrounding program. South Palm Beach indicated that they do not have any planned improvement projects that might impact the Town’s proposed undergrounding program. 4.3.5 Florida Public Utilities The consultant team coordinated with various representatives from Florida Public Utilities (FPU) regarding FPU’s existing infrastructure as well as FPU’s ongoing replacement of gas main infrastructure throughout the Island. FPU provided atlas level data of their system of gas transmission and distribution pipelines across the Town. They also provided information related to their gas main replacement program 30 FOUR 30 | | CHAPTER CHAPTER four for the purpose of coordinating this replacement work with the undergrounding program. The information included proposed project areas identified by FPU to be completed within the next three to five years, or by 2021. Representatives of FPU indicated that they are flexible in the implementation of the remainder of their replacement program in order to better accommodate the needs of the Town. However, this flexibility is subject to a mandate that they replace all bare steel pipe by 2021. FPU agreed to review the desired timing of their projects with the Town’s proposed undergrounding phasing plan and highlight areas of critical main replacements within each phase. FPU also agreed to continue to coordinate with the Town as FPU and the Town move forward with each of their programs and more detailed designs are developed. Based on information provided by FPU, there are proposed gas main replacements all over the Island. More specifically, areas anticipated to be completed in 2017 and 2018 include areas within Peruvian and Worth avenues and along South Ocean Boulevard from Sloan’s Curve to Southern Boulevard. Other proposed project areas include the remainder of Chilean and Peruvian avenues, various areas throughout Mid- Town, and the majority of the north end of the island, north of Palm Beach Country Club. FPU indicated that they do not have any planned improvements south of Sloan’s Curve. FPU indicated that they plan to relocate the existing gas main from the rear of residential properties to the front of the property where possible. FPU also indicated that it takes approximately two weeks to bore down one block, and one additional week to perform milling and overlaying of the roadway. The consultant team prepared draft gas main replacement maps and in August 2016 met with various FPU representatives to discuss FPU’s proposed gas main replacement program as well as the Town’s proposed undergrounding phasing plan. Gas mains that are not scheduled to be replaced will need to remain in service during the implementation of the program and after completion of the program. Flagler Memorial Bridge construction by FDOT TOWN of OF palm PALM beach BEACH Town