Palm Beach Undergrounding Master Plan COMPLETE MP Online-v4 | Page 104

y y Conduit installation (undergrounding) y y Equipment and cable installation (undergrounding) y y Pole and wire removal (undergrounding) y y Watermain installation y y Drainage improvements y y Traffic signal modifications y y Installation of signal interconnect y y Street Lighting improvements y y Pump station improvements and may reduce the width of the travel lanes. However, they will not eliminate the use of any travel lanes. detour depends on the width of the road. This is further evaluated below. Construction activities using shoulder closures are: 9.4 General Project Schedule and Construction Sequence y y Conduit installation (undergrounding) y y Equipment and cable installation (undergrounding) y y Pole and wire removal (undergrounding) y y Street Lighting improvements y y Pump station improvements y y FPU gas main replacement Short-term Closure The use of a multiple-lane restriction, weekend closure, or night- time closure will be determined during design and construction of each phase. A complete direction closure consists of prohibiting any traffic by public motorists from entering or exiting the roadway in a defined direction of travel (i.e., northbound or southbound) for an established length construction zone and quantitative duration. In the case of the north-south thoroughfares, this closure could be applied in both the northbound and southbound directions of travel. Although not anticipated to be needed often for the undergrounding program, if needed, these closures could span a maximum distance of one to two blocks of roadway at a time and be restricted to a weekend time frame. In the case of the main east-west arterials and the local residential, commercial or mixed- use roads, the need for their closure to traffic or availability for a Shoulder Closure A shoulder closure consists of prohibiting any traffic by public motorists from driving on the roadside shoulder in a defined direction of travel (i.e., northbound or southbound) for an established length construction zone and quantitative duration. In the case of the north-south thoroughfares, this closure will be applied in both the northbound and southbound directions of travel. The closures are anticipated to span the time required to complete the construction of facilities outside of the travel lanes 84 | CHAPTER NINE The undergrounding of overhead utilities, namely electrical and communication (FPL, AT&T, Comcast) is planned to occur in eight phases with starting dates from 2017–2024. Additionally, other sets of improvements are planned to occur during the same time as the Undergrounding. These improvements include the Florida Public Utilities (FPU) Gas Main Replacement Program, City of West Palm Beach Watermain Improvements, the FDOT Southern Boulevard Bridge Replacement, and the Town’s Accelerated Capital Improvement Program (ACIP) and Capital Improvement Program (CIP). The FPU gas improvements include the installation of new gas pipelines and is proposed to occur from 2017 to 2021. The City of West Palm Beach Watermain improvements are expected to occur during the undergrounding program and be confined to the undergrounding phase project area during any given year. The FDOT Southern Boulevard Bridge Replacement will occur between 2017 and 2021. The Town’s ACIP improvements are planned to occur from 2017 to 2019 with other CIP improvements occurring within the current five-year planning horizon, to 2022. These sets of improvements were considered when recommending Transportation Management options. The table on the following page has the anticipated construction sequence. See also Section 6 of this Master Plan. The initial construction activities in any given phase will include conduit construction by a mixture of open cut trenches and directional boring along with the installation of equipment and cabling. The final six months of any given phase will include the removal of the existing overhead poles and wires. Therefore, there will be an overlap when adjacent phases will experience construction impacts potentially requiring road closures near each other. In general, the most significant road disruption (conduit installation) will be scheduled to occur between May and November. During the season (December through April), less disruptive activities are planned that will require intermittent road impacts such as pulling cable and setting equipment. As the focus of the program is the underground conversion of overhead utilities and known large infrastructure programs, the following are not currently included in the major work elements but could have some impacts to traffic behavior in the Town: y y Beach renourishment projects y y Private construction (homes and businesses) TOWN OF PALM BEACH