Our Maine Street's Aroostook Issue 17 : Summer 2013 | Page 53

- - - Expansion - - - rd of trustees asked the Town of On March 27, 1991 the library boa for a federal grant of $115,850 to Fort Fairfield for permission to apply t library. This addition would add add a community room to the presenor for access to the upper level and much needed storage space, an elevat t would be approximately $232,715. handicapped accessibility. The total cos be responsible for the remaining The Town of Fort Fairfield would rtly after the Fort Fairfield Rotary $116,865. Permission was granted, shothis construction project. t Club donated $10,000 to help suppor National Register of Historic Places In 1989 the library was added to the Carnegie library has to be 021. Due to this fact, the facade of the the south or backside of #88003 be built on preserved. Thus, the addition would ck veneer would have to conform to the building. The steel frame and bri any visual incongruity. the present facade. There could not be lt was by Voisine Construction of In 1993 the addition to the library bui Fort Kent, Maine. unity Room has a large on the first floor addition, the Comm and a much larger room Located all kitchen storage room, handicap bathroom, a sm as Boy Scouts, Girl Scouts, service h to be used for community meetings suc at no fee. ms organizations and federal/state progra arged office for the librarian and a The second floor addition has an enlalong the walls. The total expansion children’s reading room with shelving was projected at 2,600 square feet. SUMMER 2013 53