New Construction Products August 2017 - Page 16

The excavation site’s close proximity to a critical road and active runaways wasn’t even the biggest challenge for Midwest REM, it was the restrictions on overhead space. “Powerlines were not the obstacles; the flying planes were the overhead obstacles.” Chicago Area Contractor Chooses Slide Rail Over Sheeting for Massive Pump Station Install at O’Hare Airport By James McRay 14 New Construction Products • August ‘17