the best uses of each lab and how to reconfigure them to coordinate with
their courses. These renovations will make such a positive difference for our
students and faculty.
The renovations included some minor construction, new paint, new LED
lights (wherever possible) and new flooring. The work was done by Gurney
Kerr, GK Electric, Henderson Painting, Kieran McKenna flooring, and our
ANC facilities team.
During this project we donated a lab table, wood cabinets and science
scales to the Kempton New Church School, plus lab cabinets and chairs to the
Bryn Athyn Church School.
Here are some before-and-after pictures:
ANC Summer Programs
We had another successful Performing Arts Camp. This was a whirlwind
two weeks of ANC Performing Arts Camp with 50 sixth, seventh and eighth
graders – several of whom are ANC students this year. Some students arrived
a few days early to help build the sets. Both performances of Disney Junior
Beauty and the Beast were packed.
We had a fun-packed summer camp with 115 attendees, and a very
successful Tools 4 Life Camp (see report elsewhere in Church News).
491