My first Magazine dsi-info-23-en | Page 59

Construction—APAC—Singapore—Commercial Buildings 2 level tall steel trusses once again served to support the overhanging block which cantilevers by 9.5m from 3 prestressed walls. The top chords of the huge steel trusses were connected to the walls via post-tensioned beams. 16 75mm Ø DYWIDAG Bar Tendons were used to prestress these beams. Each of the 3 walls was prestressed using 10 vertical 75mm Ø DYWIDAG Bar Tendons. The DYWIDAG Bar Tendons were only installed from level 10 up to level 25. Weighing 35.9kg/m, the very heavy DYWIDAG Bar Tendons posed a challenge during installation. The individual bars weighing approximately 160kg had to be hoisted into position by tower crane and coupled at every 4.5m casting lift of the wall. The total coupled length of each individual bar tendon was approximately 80m. As the DYWIDAG Prestressing Bars must not be subjected to any bending, they had to be installed t