Construction—APAC—Australia—Commercial Buildings
All 37 strands in one cable were installed
parallel to prevent entangling and friction of
the individual strands in each cable bundle.
Due to limitations in stressing space and
maximum weight restrictions, stressing was
carried out using a monostrand jack. In total,
10 DYWIDAG Strand Post-Tensioning
Tendons were used. DSI not only supplied
the necessary DYWDAG Post-Tensioning
Tendons, but also supported the contractors
in the correct use of the post-tensioning
systems. The DYWIDAG Post-Tensioning
Systems were installed, stressed and
grouted by the subcontractor Postenco.
Owner
Walker Corporation, Australia
General Contractor
Brookfield Multiplex, Australia
Contractor
Form 700, Australia
Subcontractor Post-Tensioning
Works
Postenco Pty. Ltd., Australia
Architects
The Buchan Group and akin creative,
both Australia
DSI Unit
DYWIDAG-Systems International Pty. Ltd.,
BU Civils, Australia
DSI Scope
Production, supply, technical support
DYWIDAG Products
10 DYWIDAG Strand Tendons with
Type 6837 MA Anchorages and
eight 57mm Ø DYWIDAG Bar Tendons
45