Construction—North America—USA—Bridges installed by the General Contractor, assisted by DSI technicians and engineers, from November 2014 to November 2015. DSI was awarded the contract to supply the DYNA Force ® Measuring System including a remote controlled readout unit for the long- term monitoring of the forces acting on the stay cables. With a total of 264 DYNA Force ® Sensors for Type 0.62" Strand and 3 readout units equipped with a remote system supplied, the Abraham Lincoln Bridge is the largest application of DYNA Force ®  Sensors for DSI in Post-Tensioning so far. The first lanes were opened to traffic approximately 4 months earlier than planned at the beginning of December 2015. The complete Downtown Crossing Project including the rehabilitation of the Kennedy Bridge and the connecting roads on both sides of the Ohio River is expected to be completed by the end of 2016. Owner Kentucky Transportation Cabinet (KYTC), USA General Contractor Walsh Construction Company, USA Contractor Milestone Contractors, L.P., USA Engineering (Lead Design) Jacobs Engineering Group Inc., USA Engineering (Design) COWI Bridge North America (formerly Buckland & Taylor Ltd.), Canada DSI Units DYWIDAG-Systems International GmbH, BU Special Projects, Germany and DYWIDAG-Systems International USA Inc., BU Post-Tensioning, East, USA DSI Scope Production, supply, engineering services, technical support, supervision DYWIDAG Products 176 Type DG-P37, DG-P48, DG-P55, D