My first Magazine dsi-info-23-en | Page 69

Construction—EMEA—Austria—Slope Stabilizations The stabilization of the embankment required 1,170 R32-320kN DYWI ® Drill Soil Nails with a total length of 7,400m, 50 R38-550kN DYWI ®  Drill Soil Nails with a total length of 370m and 130 R51-660kN DYWI ®  Drill Soil Nails with a total length of 900m. For the foundation of the rockfall protection structures, 185, 43.5mm Ø GEWI ®  Plus Bar Anchors with a total length of 400m were used according to the system description provided by the manufacturer. All of the systems were supplied complete with accessories. Owner ÖBB Infrastruktur AG, Austria General Contractor Swietelsky Bauges.m.b.H., Austria Consulting Engineers IBK Ingenieurbüro Kronawetter ZT Gesellschaft mbH, BGG Consult Dr. Peter Waibel ZT GmbH and PULSE Engineering GmbH, all of them Austria DSI Unit DYWIDAG-Systems International GmbH, Austria DSI Scope Production, supply DYWIDAG Products 1,170 R32-320kN DYWI ® Drill Soil Nails, 50 R38-550kN DYWI ® Drill Soil Nails, 130 R51-660kN DYWI ® Drill Soil Nails, 185, 43.5mm Ø GEWI ® Plus Bar Anchors 69