Construction—North America—USA—Structural Repair Solutions
Access was the most challenging component
of this repair program and required the utmost
attention to detail. DSI provided a total of
4 man baskets for access to the upper boot
locations. Each basket was individually
controlled with a safety spotter to ensure safe
movement up and down the pylon exteriors.
The repair work on the Talmadge Bridge was
completed safely, on time and on budget in
February 2016.
Owner
Georgia Department of
Transportation (GDOT), USA
General Contractor
TIC – The Industrial Company, USA
Subcontractor
DYWIDAG-Systems International
USA Inc., Structural Repair, USA
Consulting Engineers
TranSystems Corporation, USA
DSI Unit
DYWIDAG-Systems International USA
Inc., Structural Repair, USA
DSI Scope
Supply, installation, technical support
DYWIDAG Products
Anchor cap seals, corrosion inhibiting
compound, stay cable pipe tape
143