MUHC Launch Magazine 2014 | Page 82

Transition THE GLEN SITE CONSTRUCTION IN NUMBERS: • 13 megawatts of generators • 58 elevators • 89 air conditioning units (as big as buses!) • up to 1,800 workers during the peak construction period • 5,746 construction piles • 12,500 rooms • 34,272 light fixtures • 238,000 m 3 of concrete • And… 1,000,000 m 3 of excavated earth 82 SITE GLEN SITE 2014-2015