Montgomery Maxwell JLUS Report montgomery_maxwell_afb_jlus_report_june_2017a | Page 111

Military Compatibility Area   Strategy  Other Primary Partner: MWW VO‐1B  MCA‐5  Ensure Federal Aviation Regulation (FAR) Part 77  Compliance  For all new, redeveloped, or rehabilitated buildings  or structures including transmission,  communications, or energy generation structures  (including electrical transmission towers/lines,  cellular and radio transmission towers, wind  generation towers, and other similar structures),  ensure compliance with FAR Part 77 height limit  requirements to minimize vertical obstructions.  In  addition, ensure the developments and structures  are compatible with, and do not pose a safety  hazard to, air operations in the region.  Other Primary Partners: City of Millbrook, Town of  Coosada  2018          VO‐1C  MCA‐5 and  Require Imaginary Surface Heights and Slopes  VOAA  Compliance  For all new, redeveloped, or rehabilitated buildings  or structures including transmission,  2018           June 2017 Joint Land Use Study Report Page 95