Leadership Magazines Issue 17 Scott & Rhonda Ford | Page 54
CAMPUS UPDATES
Corporate Campus
Expansion
As do-TERRA continues to grow at a
rapid rate, the corporate campus is
also expanding to keep up. As a result,
Phase 2 of construction launched sooner
than anyone originally expected. Now,
a year after the completion of Phase 1,
Phase 2 of construction on the do-TERRA
corporate campus is complete.
To celebrate the expansion, executives
held a ribbon-cutting event in the newly
finished auditorium, and talked about
the vision and mission of do-TERRA.
Various government officials, business
leaders, Wellness Advocates, and
employees attended the gathering.
Member Services extension. The fourth addition to the
corporate buildings provides room for the growth of Member
Services, as well as an auditorium and two reception areas.
Product Center. Here, Wellness Advocates and customers
alike can come to purchase and pick up essential oils, blends,
and oil-infused products. The Product Center also features
informative videos and a children’s play area.
Auditorium. With seating for 279 people, this room was
designed with the help of acoustic engineers to help
maximize sound quality in the space. The auditorium sits 5.5
feet lower than the rest of the campus, providing extra space
for stadium seating.
dōTERRA Spa. With three treatment rooms that offer
services from facials to massages and even the AromaTouch®
Technique, the spa helps you relax as you experience the
incredible benefits of essential oils.
Production Facility. With nine production rooms and eight
precision filling machines, production teams work 24 hours
a day, five days a week to produce and package all the
essential oils, beadlets, and labeled international cosmetic
products offered by dōTERRA.
Construction material used to create the campus includes:
3,020 tons of steel
54
Approximately 100
miles of electrical wire
(just over 500,000
linear feet)
dōTERRA ESSENTIAL LEADERSHIP I NOVEMBER / DECEMBER 2015
Nearly 30,000 feet of
rectangular ductwork
(over 193,000 pounds
of galvanized steel)
with an additional
16,500 linear feet of
round duct
More Production Facility facts:
22,743 linear feet of
copper refrigeration
lines
More than 75 percent
of the debris hauled
away was taken to
recycling facilities
Over 1,000,000 man
hours invested to
complete the entire
project.
The facility has over
3,000 pallet locations.
Essential oils are stored
in 1 ton stainless steel
tubs before processing
to ensure quality and
safety. On a monthly
basis, between 5.5 and
6 million bottles of
essential oils and blends
are produced.
Built with future plans
in mind, the warehouse
can be expanded by
dropping the back wall.
An addition could then
double the size.
The existing building
is equipped with 16
solatubes and many
more skylights to take
advantage of natural
light. The climate of the
building is also carefully
maintained, including
a cool storage room, to
help preserve the quality
of the essential oils.
www.doterra.com
55