Landscape & Urban Design Issue 34 2018 | Page 48

GPAD GPAD DELIVERS GRADE A OFFICE REFURBISHMENT IN PRIME BRISTOL LOCATION London architectural practice The imposing exterior, originally gpad has completed the office constructed in 1987, leads through to refurbishment of One Cathedral a striking, naturally lit central atrium Square in the heart of Bristol City surrounded by large open floorplates. Centre for Castleforge Partners. Overlooking the harbour-side, this stunning and modern building provides Grade A office accommodation in a prime city location. A living wall of lush, vibrant greens spanning from the ground level up creates an impressive focal point drawing the eye upwards into the expansive, contemporary atria. People on upper levels benefit from floor to The 53,696 sq. ft. flexible office ceiling glazing, allowing them to enjoy environment spans four floors and is the inspired view across the foyer and a welcome addition to the significant down into the reception area. regeneration in the surrounding area, which has taken place in the past decade. By incorporating full access raised floors, metal tile suspended ceilings and air conditioning, the team has created an adaptable, agile space for open plan or partitioning to maximise flexibility and cater for future demand. 48 Landscape & Urban Design Issue 34 2018 Designed with healthy living in mind, occupiers have at their disposal 50 bike racks, shower facilities, and drying areas opening up the option of cycling to work. The layout encourages people to walk around the building using the spacious reception atria and internal terracing as break-out spaces.