Landscape & Urban Design Issue 30 2018 | Page 61

STEP 1: Examine the STEP 2: Remove Old Deck Substructure Boards Before removing any boards, After obtaining any necessary hardware for code compliance, check your deck's joists building permits, carefully structural integrity, and and the overall condition of remove and discard the old compliance with your chosen the framing to ensure the decking and railing, leaving decking material. Consult substructure is sound before the substructure and framing the decking manufacturer's proceeding. If the foundation in place. installation guide for specifics. STEP 3: Follow Your Guides Inspect all framing/framing and deck framing system are sound, you're good to go. STEP 4: Level It Out STEP 5: Install New Deck Boards To ensure a level surface for Begin laying out the new deck the new deck boards, make boards. Be sure to closely follow sure that the joists are level the instructions for spacing and even with each other. from the manufacturer's You may need to shim or installation guide. Consult the shave the joists to make installation guide regularly, and them level and even. if you have any questions along the way, call customer service before proceeding. STEP 6: Add Posts STEP 7: Complete with Railing Attach new pressure-treated Slide sleeves over the railing structural rail posts to posts and assemble railing and framing as required by code balusters per the installation and the installation guide. guide. Finish off by adding your choice of decorative elements, such as post caps and top rail caps. STEP 8: Enjoy for Years to Come Your deck makeover is now complete, but your enjoyment is just beginning. With a 25-year Limited Fade and Stain Warranty, your Trex deck will look great for years to come, and unlike wood, it requires no sanding, staining or painting, and resists fading, staining, scratching and mold. So sit back, relax, and enjoy! 61