VILLAGE OF KEY BISCAYNE UNDERGROUNDING OF UTILITIES — MASTER PLAN Having the Village’s selected contractor perform most of the work is the best method to guarantee work is performed in a timely manner. Because the Village’s selected contractor has a strong and direct contractual obligation to meet an agreed-upon schedule, the risk of schedule impacts caused by the contractor are reduced. To reduce schedule risk posed by elements of construction that must be performed by the utility owners it is critical a detailed construction schedule clearly identify when the activities are required during the project and their duration. All dates and durations must be clearly communicated to the utility owners and the Village must obtain a commitment to those dates from the utility owners prior to the commencement of each phase. Coordination meetings should be held on a regular interval and should include the utility owners. At these meetings any schedule or sequence adjustments made should be discussed and coordinated. Experience has shown employing a well-qualified Construction Manager has been extremely beneficial in facilitating this process. Some level of unforeseen conditions can be expected with any project of this scale. When unforeseen conditions do arise, it is important the design team, construction team, utility owners, and Village work together on developing solutions as quickly as possible to avoid schedule impacts. The team’s focus should remain on development of a solution until the unforeseen condition is overcome to minimize or eliminate schedule impacts. During previous projects the service conversion process has presented challenges when absentee and/or unwilling property owners are encountered. To compound the challenges, communication companies consider their customer information to be confidential, which often makes it difficult for outside entities, including the construction team or owner, to contact absentee property owners and/or discussing concerns with unwilling property owners. Having a strong public outreach component that proactively reaches all property owners offers them an understanding of the project and how they will be individually affected is recommended. This will mitigate the risk delayed service conversions on the part of individual property owners cause delays to the overall project. Performing this outreach continuously and early also aids in identifying where problems may be encountered in the future so proactive actions can be taken. 80 When an owner’s service entrance does not meet the National Electric Code, it will need to be upgraded prior to service conversion process. To reduce the impact of delays caused by this condition the following process is recommended:  During the design phase a review of all meters shall be performed to determine where code issues may exist  The Village can then notify these property owners that their service entrances need to be upgraded in advance of the project along with instructions on how to initiate the work  If by the time construction begins the work has not been completed by the property owner, we recommend the construction contract include an allowance line item for the Village to perform this work on behalf of the property owner  Finally, the associated costs should be assessed against the property by the Village After service conversions are completed, the de-energized overhead wires and poles must be removed by the utility owners. This type of work is considered very low priority for the utility companies and they will demobilize from the project if they are needed to respond to another service repair or recovery effort elsewhere in the system, presenting a