VILLAGE OF KEY BISCAYNE UNDERGROUNDING OF UTILITIES — MASTER PLAN Risk Assessment Risks are involved with any project, and a project of this magnitude is no exception. These risks can impact the project schedule and/or the project costs. By identifying these risks ahead of time, steps can be taken to mitigate them. An assessment of known risks to budget and schedule, both in terms of the design phase and construction phase, was made in order to identify these risks and take steps to mitigate them. Undergrounding Task Force (UUTF), utility owners, Village residents, and the media. The program will engage and communicate with the community through presentations, print and electronic media, public meetings, and through a Speakers Bureau. Traffic Management Plan Development A Transportation Management Plan (TMP) was developed to coordinate traffic impacts related to both the undergrounding program and other known significant infrastructure projects to minimize impacts to the residents and businesses. Based on the recommended phasing and the sequencing plan, Kimley-Horn assessed the potential traffic impacts from construction of each phase of the project. The TMP sets forth overall guiding principles, identified in Chapter 9, for use by the Village and affected contractors during the implementation of the undergrounding program. The TMP may evolve over time, but its current role is to assist in the development of the construction phasing plans, traffic control plans, and project specification documents, and to facilitate discussions between the Village, designers, utility owners, contractors, and other key stakeholders related to traffic impacts. It is a tool to better coordinate construction traffic impacts as specific permits are applied for by the construction community. Graphical TMP maps for each phase of the undergrounding program, along with general traffic control guidelines for the program, were developed and are contained in this master plan. Public Outreach Program Recommendations The undergrounding project in the Village of Key Biscayne will incorporate a Public Outreach Program to ensure that the community is informed on the process, the benefits, and costs. The Community Outreach Program is a critical part of the public education and transparency efforts. It will create a link between the engineering team, Village staff, elected leaders, the 4 Information and communications to the community should be made through a variety of mediums and be performed in a manner that is most suitable for the intended audience. For broad based messaging and project updates, the following methods should be employed:    Project website      Newsletters or postcards (electronic and printed direct mailers) Project Facebook page/Twitter postings Use of the social app, Nextdoor, to connect neighbors and the community Email blasts Public meetings (including live Tele-Town Hall meetings) Media releases Communications hotline (telephone) For messaging related to communicating how the project and individual phases may impact a particular resident or business owner, the communication should be tailored to the specific situation. These