consideration to ensure an outstanding
event experience for attendees. The back-ofhouse artist building is designed to provide
artists with the best possible environment
to support their performance, including
multiple dressing rooms and a VIP guest
meet and greet space.
Daily’s Place will be fully integrated into
EverBank Field. At the ground level, the
new south end zone field super-tunnel will
lead to a brand new central bar connected
to the amphitheater entrance. The existing
Bud Light Party Zone and Terrace Suite areas
will now be linked to the amphitheater’s
elevated seating decks via access bridges at
each level.
The covered flex field includes a regulation
size football field with more than 20 feet of
auxiliary space around the artificial playing
surface. Flanked on the north and south
side by massive hangar doors, the facility
can be used independently or opened up to
the amphitheater. Along the south side of
the property are four more enormous sliding
doors that, when opened, create an open
air experience. When the doors are closed
to the flex field, the space is fully climate
controlled.
The construction of Daily’s Place represents
phase 2 of the $90 million investment in
EverBank Field announced by the City of
Jacksonville and the Jaguars in January.
Phase 1 included the improvements to the
US Assure Club and the creation of the south
end zone super-tunnel.