Ingenieur Vol 73 ingenieur Jan-March 2018 | Page 58

INGENIEUR Figure 8 - Locations of Identified Risk Factors for Level 2 Risk Assessment Table 1 – Risk Factors Identified for Level 2 Risk Assessment R1 R2 R3 R4 R5 R6 6 56 Piping at old river course due to arching effect at the filled embankment Ch400. Excessive settlement resulting in cracks at the dam embankment due to thermally altered granite at the dam foundation Ch350 to ch950m. Piping at the left abutment might lead to blow out at Weng Lee Quarry face due to layer of whitish thermally altered granite. Cut slope instability at draw off tower No.2. Ch.1750 Piping through the left abutment at the existing dam due to layer of a porous weathered granite. Piping of the existing dam during construction of raising existing dam due to excavation at the toe of dam. VOL VOL 73 55 JANUARY-MARCH JUNE 2013 2018 R7 R8 Risk of collapse of the existing dam during trenching for the construction of a plastic concrete cut off wall. Piping through the clay core of the dam embankment due to a low stress zone along draw off culvert. R9 Slope instability at the inlet channel of the spillway. R10 Impact of rock blasting at the Weng Lee Quarry on the integrity of plastic concrete walls and the grout curtain of dam. Slope instability of hills at the reservoir rim during the operational stage. R11 R12 Instability of the Tunnel Inlet Portal during construction. R13 Instability of the Access Bridge to the Draw-off Tower No 1.