Ingenieur Vol 73 ingenieur Jan-March 2018 | Page 46

INGENIEUR
INGENIEUR
Diagram 3 : Overall Sabah-Sarawak Gas Pipeline ( SSGP ) 36 ” x 513 km Schematic
FROM SOGT
!
! !
LAUNCHER ESDV
HV2621-22
2623 KIMANIS METERING STATION
BV120
BV119
KP466
KP444
HV2620
KP00
BV118 BV117 BV116 K421 KP400 KP373
BINTULU COMPRESSOR STATION BV121 KP481
AG
UG
UG
AG
Dalak Tie-in KP71
BV101 BV102 BV103 BV104 BV105 KP15 KP39 KP61 KP83 KP106
BV115
LAUNCHER
KP343
RECEIVER
SAMUR Tie-in KP91
HV2923
HV2921 LONG-LAMASCRAPPER STATION
HV2703
AG UG
HV2912
UG
AG
KP503
BV106
RECEIVER
KP122
LAUNCHER
LAWAS SCRAPPER STATION
HV2911
BV107 KP143
BV108 K166
BV109 KP193
BV114
BV113
BV112
BV111 BV110
KP321
KP299
KP274
KP245
KP217
DRY GAS DIVERTER
MANIFOLD GMS-A ( MLNG-2 )
RECEIVER LAUNCHER
HV2950
HV2954 GTC # 1 GTC # 2 GTC # 3 GTC # 4
UG
AG
BV122 KP495
RECEIVER
HV2701-2
HV2755 BINTULU METERING STATION
SDV410 KP513
GMS-B ( MLNG-3 )
SSGP Pipeline having : 1 Launcher at KMS , 3 Scrapper Station , 1 Compressor Station , 1 Receiver at BMS ( totally 4 piggable section ), Metering Station at KP0 and KP503 , 19 Valve Station
Open
Diagram 3 : SSGP Schematic
Diagram 4 : SSGP Elevation Profile
Eleva1on ( m )
Pipeline Properties
NPS Pipeline roughness Heat Transfer C oefficient Underground soil temperature MAO P Pipeline wall thickness : -First 100km and last 50km - Remainder of pipeline
Value
Unit
36
Inches
0.0006
Inches
3.0 2
W / m 2 . C
25
C
96
barg
19 . 78
mm
16 . 75
mm
Distance ( km )
Diagram 4 : SSGP Elevation Profile
44 VOL 73 JANUARY-MARCH 2018