Ingenieur Vol 71 ingenieur July 2017 | Page 20

INGENIEUR was lower when compared with the average office building in Malaysia. However, we believe that JKR Complex still has the potential to achieve an energy-efficient office building BEI if saving measures proposed in this article are implemented. The breakdown of the overall energy consumption of the buildings shown in Figure 5 above shows the highest (66.14%) was consumed by the air-conditioning and ventilation system and the second highest was the internal lighting (21.53%) followed by office equipments and domestic usage (7.5%) and the elevators (3.65%). Energy Saving Measures The recommended energy saving measures, ‘with cost’ and ‘without cost’, in mid-year 2016 until June 2017, to reduce the existing BEI of 127 kWh/ m 2 /year, are shown in the two tables below. After the ‘without cost’ cost-saving measures have been taken and those in item 2 of the ‘with cost’ section have been made, the BEI readings of JKR Complex may be reduced from a BEI 127 reading to an even lower BEI reading if the cost savings for items 1 and 3 in the ‘with cost’ section are executed. In June 2017, the JKR Building Maintenance Facility Branch in collaboration with the Building Sector Energy Efficiency Project (BSEEP) agreed to carry out item no. 4 - to install the Online Monitoring System. The objective of this installation is to monitor the energy consumption of each block at the JKR Complex and to provide 1) ENERGY SAVING MEASURES WITHOUT COST No. RECOMMENDED ENERGY MEASURES 1 2 3 4 Air Conditioner at Prayer Room/Surau Block F to operate only from 12 pm to 5 pm. Operating time adjustment of air conditioning system Implementation of energy saving programmes: Awareness Programme Role of Level Officer to switch off the lights during the afternoon break Periodic inspection Turning off 80% of indoor lighting during lunch break. TOTAL 2) ENERGY SAVING MEASURES WITH COST No. RECOMMENDED ENERGY MEASURES 1 2 3 4 6 18 Replacement of 2 chiller units and 3 cooling units in the cooling tower Replacement of 4,763 existing lighting units in Block F to LED energy-efficient lamps. Replacement of air ducting at Block F Online monitoring system for energy consumption of each block at JKR Complex TOTAL VOL - SEPTEMBER 2017 VOL 71 55 JULY JUNE 2013 ESTIMATED YEARLY SAVINGS (kWh) 936.00 10,731.00 15,876.00 72,915.14 100,458.14 ESTIMATED YEARLY SAVINGS (kWh) 182,520.00 233,348.00 224,238.00 640,106.00