Ingenieur Vol. 64 Oct-Dec 2015 Ingenieur Vol 64 Oct-Dec 2015 | Page 38

BOOK REVIEW Harbans’ Engineering and Construction Contracts Management Commencement and Administration Second Edition Ir. Harbans Singh KS ISBN : 978-967-400-306-7 INGENIEUR Harbans’s Engineering and Construction Contracts Management: Commencement and Administration is the third title in the series; the first edition review, will however attempt highlight what I Author: Ir. positively Harbans Singh of which was and widely accepted by the industry. This book focuses on theI downstream activities of a typical to engineering/construction contract. Amongst the principal topics addressed are the commencement of works/operations at the site, contract administration, consider to be some of the salient areas. progress ISBN: 978-967-400-306 monitoring, delay and extension of time, non-completion and damages. These topics are addressed in relation to all the recently revised local There are various standard forms of contract Forms1,050 of ConditionsPages of Contract. SoftStandard Cover, used in Malaysia. Since the publication of the first Price: RM 250 edition, there have been significant amendments Key Features to the PAM, JKR and IEM forms of contract. All Publisher: LexisNexis Malaysia This book provides practical guidance to those involved in the management of engineering and/or construction contracts in Malaysia and these forms of contract have become more other counties having similar legal regimes. Sdn Bhd Coverage extends to the building industry infrastructure, engineering systems and oil & gas. detailed and elaborate, in particular the PAM form. Clarity of presentation with figures, flowcharts, diagrams and check lists, simple language and ease of comprehension to both legally and The second edition of this book comprehensively non-legally trained readers. By Daniel Tan Barrister-at-Law, Table of Contents Principal of the law firm Chapter 1 Post Contract Award Phase Messrs TAN CHUN HAO Chapter 2 Commencement of Works/Operations addresses the relevant amendments thus keeping readers up-to-date with the latest developments on this front, evident for example in the Chapterand 4 clearly Contract Administration sectionsChapter on performance bonds, extension of time 5 Progress Monitoring On Site: Preliminary Issues Chapter 6 Delay & Extension of Time claims, and loss & expense claims. Chapter 3 Commencement of Work On Site: Chapter 7 Non-Completion and Damages Most contracts have certain requirements or Issues and Procedures r. Harbans Singh KS needs no introduction. In formalities when it comes to submission of notices the construction law and dispute resolution and claims. With the PAM 2006 forms of contract About the Author he is a household name. fraternity in Malaysia, being a lot more detailed and elaborate (when Ir. Harbans Singh is a edition Professional Engineer, Chartered Engineer, Arbitrator, Advocate and Solicitor Ir. Harbans’ second of ‘Commencement compared to Mediator, the PAMAdjudicator, 1998 forms), Harbans has (non-practising). He commenced his career with the Public Works Department, Malaysia before joining an international German and engineering Administration’ has been released 12 highlighted an important area for contractors consultancy practice with whom he worked locally and then in Koblenz, Germany as a designer, resident engineer and yearscontract after administrator. the first Later edition and served comes Ir. Harbans with with a local consultancy firm in various professional capacities is presently and sub-contractors to heed in and respect of domiciled in Malaysia where he construction resolution. He is a regular contributor to The Ingenieur, the comprehensive updates onis active the in law. With law anand dispute the provisions for notices and claims for both Malayan Law Journal, The Law Review and other professional publications. He is the recipient of a number of awards including additional 400 pages over the Tan firstSriedition, extensions ofBarclay time Award and loss & Chartered expense. Many, Institution of Engineers Malaysia’s Haji Yusoffthe Prize (2001), the Cedric and the Institute of the Diploma in International Commercial examination effortArbitrator’s requiredAward for for research and putting pen to Arbitration if not all, of such(2003). provisions on the procedure paper was certainly no mean feat. are now mandatory requirements that have to Ir. Harbans is also the author of a series of four books entitled Harbans’ Engineering and Construction Contracts Management, This third book in the series of four focuses be the claims will even co-author of The PAM 2006 Standard Form of Building Contract andcomplied Constructionwith Law in before Malaysia, contributor to The Malaysian Standard Precedents and Forms: Engineering & Construction Contracts and is aby regular speaker atadministrator. courses, seminars The and on contractual matters that often have to be be considered a contract conferences. addressed after a contract has been awarded explanations and flowcharts in the second edition to a contractor or sub-contractor. Whilst it is not make light reading in this complex area. possible for me to list down all the differences The Construction Industry and To order, please contact our Helpdesk at Tel:Payment 1800.88.8856 between the two editions of the book in this E-mail: Adjudication Act 2012 just came into effect in [email protected]: @HelpLNMY I 6 36 VOL – DECEMBER 2015 VOL64 55OCTOBER JUNE 2013